Atalaya Towers

MURRELLS INLET SC


The Blog

Check back here often to see what we have updated.

Atalaya Blog

blog title

Fall Projects

Now that summer is over, and traffic is lower along with the time of year for lower humidity we are projecting the week of October 17th to hopefully finish up the last 6 floor corridors. The last 6 floors are including 6th floor down to 1st floor. We will as usual be notifying rental agencies in order for them to pass on the plan to incoming guests. We discovered that night work enables occupants to pretty much have a normal day just needing to remain in unit from 7pm until next morning. We feel the contractor does not feel rushed, and can concentrate on proper, and acceptable results. we will also post project plans in elevators and ground level. Also, if you notice any issues on your balcony that need to be looked at by contractor please let the office know. Our mission is to stay ahead of issues.

Also, the next project will be our annual proactive bed bug inspection and protection. We normally do this in December, but, this year we are conducting this starting November 20th. The contractor will be coming through with a thorough inspection split into two Saturdays finishing on the 27th. as usual we need 100% participation in order for warranty to be valid.

Also, this time of year brings unit remodeling. As stated in Presidents letter please make sure your contractors check into the office to discuss scope of work. We can then be sure all contractors are aware and understand the need to follow building protocols. This will alleviate any issues/concerns once renovations begin..

Thank you

Atalaya Towers Management

Posted in:
comments powered by Disqus

About

OFFICE: 843-651-4566
AFTER HOURS: 843-946-3029
RESERVATIONS: 855-756-4949
FAX: 843-651-1612

Our Location

912 NORTH WACCAMAW DRIVE
MURRELLS INLET
SOUTH CAROLINA 29576

Follow Us

Facebook