Atalaya Towers

MURRELLS INLET SC


The Blog

Check back here often to see what we have updated.

Atalaya Blog

Update on elevator project

As we draw closer to the starting time of the elevator project we feel that the best thing to do with our electrician was to have him get started on his portion of the project. If we wait until the actual project with one car active only it would be tied up with electricians running wiring in shaft which means the car will be tied up for owners and guests, and that means no elevator. So we have discussed with electricians to begin in September, and that involves them using one of our two running cars at this time to run their cable and drill hole in between our two cars on each corridor from top of building to the lobby. This work is crucial for the heat sensors required by law that will prevent the cars from stopping on a floor with excessive heat registering during a fire. These devices will be installed by our fire alarm contractor.

We're just trying to think of things to help move things along literally when the project begins, and maintain as much normalcy as possible.

Please stay tuned to this website for future updates

We feel that the more information, the smoother the project with little as possible inconveniences.

Thank you for your understanding

Your Board and Management of Atalaya Towers

Posted in:
comments powered by Disqus

About

OFFICE: 843-651-4566
AFTER HOURS: 843-946-3029
RESERVATIONS: 855-756-4949
FAX: 843-651-1612

Our Location

912 NORTH WACCAMAW DRIVE
MURRELLS INLET
SOUTH CAROLINA 29576

Follow Us

Facebook