Atalaya Towers



The Blog

Check back here often to see what we have updated.

Atalaya Blog

Final on Elevator and Beach work

As scheduled by June 12th all work on elevators and beach re-nourishment was completed. The elevator work went very well with the professionalism of the technicians that stayed the course with their scheduled three floors per day having both cars running by 3pm. They would stay for 30 minutes or so monitoring the operation of the cars.

The beach re-nourishment went even better if you can imagine. They were in front of Atalaya on a Saturday morning as people were departing and by Sunday morning the beach was open as they were in front of buildings South of us. We have quite a lot of beach for now. Low tide seems like a hike to get to the water now. This will change as storms come to us, but the beautiful thing is that we have beach to sacrifice.

Posted in:
comments powered by Disqus